Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

Project manager #57

Closed
wants to merge 8 commits into from
Closed
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
Binary file added README.pdf
Binary file not shown.
52 changes: 34 additions & 18 deletions documents/Management/ManagementArtifacts/management_artifact.md
Original file line number Diff line number Diff line change
Expand Up @@ -99,9 +99,12 @@ This section tracks the progress of essential project documents:
- **User Manual**

**Formula:**
$$
\text{Progress (\%)} = \frac{\text{Current Number of Completed Sections}}{\text{Total Predefined Sections}} \times 100
$$

<div align="center">

$$\text{Progress (\%)} = \frac{\text{Current Number of Completed Sections}}{\text{Total Predefined Sections}} \times 100$$

</div>

Where:
- **Current Number of Completed Sections** = Fully completed and validated sections
Expand All @@ -116,9 +119,13 @@ Key software development KPIs include:
- **Algorithm Design for Pathfinding**

**Formula:**
$$
\text{Progress (\%)} = \frac{(\text{Completed Tasks} + \sum \text{Partial Progress on Ongoing Tasks})}{\text{Total Tasks Planned}} \times 100
$$

<div align="center">

$$\text{Progress (\%)} = \frac{(\text{Completed Tasks} + \sum \text{Partial Progress on Ongoing Tasks})}{\text{Total Tasks Planned}} \times 100$$

</div>


Where:
- **Completed Tasks** = Fully developed and tested components
Expand All @@ -136,18 +143,24 @@ This section includes:
### Defect Detection Efficiency (DDE)
Measures the effectiveness of testing in identifying defects before release.

**Formula:**
$$
\text{DDE (\%)} = \frac{\text{Defects Detected During Testing}}{\text{Total Number of Defects}} \times 100
$$
**Formula:**

<div align="center">

$$\text{DDE (\%)} = \frac{\text{Defects Detected During Testing}}{\text{Total Number of Defects}} \times 100$$

</div>

### Bug Fix Rate
Measures the percentage of reported bugs that have been resolved.

**Formula:**
$$
\text{Bug Fix Rate (\%)} = \frac{\text{Fixed Bugs}}{\text{Total Reported Bugs}} \times 100
$$

<div align="center">

$$\text{Bug Fix Rate (\%)} = \frac{\text{Fixed Bugs}}{\text{Total Reported Bugs}} \times 100$$

</div>

<br>

Expand All @@ -161,9 +174,12 @@ To monitor the efficiency and well-being of the team, we track:
Measures team morale based on weekly self-assessments.

**Formula:**
$$
\text{Mood Score} = \frac{\sum \text{Individual Mood Ratings}}{\text{Total Team Members}}
$$

<div align="center">

$$\text{Mood Score} = \frac{\sum \text{Individual Mood Ratings}}{\text{Total Team Members}}$$

</div>

Mood is measured weekly on a scale of 1 to 10.

Expand All @@ -172,7 +188,7 @@ Mood is measured weekly on a scale of 1 to 10.
By applying these KPIs and their respective formulas, we ensure a structured, data-driven approach to project management, allowing for real-time progress tracking and informed decision-making.


The complete KPI document can be accessed via [link](https://spark-vessel-8f5.notion.site/KPIs-177204fa4816806ca08fe59365d99d74?pvs=4).
The complete KPI document can be accessed via this [link](https://spark-vessel-8f5.notion.site/KPIs-177204fa4816806ca08fe59365d99d74?pvs=4).
Additionally, a comprehensive visual presentation highlighting all project achievements is available [here](https://docs.google.com/spreadsheets/d/1O52cw3Ta-6EVw85Rz4RBrDvwIUuy__FmBcQSuzbgIPo/edit?usp=sharing).

<br>
Expand All @@ -188,7 +204,7 @@ you can access to them via these links :
- [Weekly Report 3](https://github.com/algosup/2024-2025-project-3-quickest-path-team-5/blob/main/documents/Management/weeklyReport.md/weekly_report_3.md)
- [Weekly Report 4](https://github.com/algosup/2024-2025-project-3-quickest-path-team-5/blob/main/documents/Management/weeklyReport.md/weekly_report_4.md)
- [Weekly Report 5](https://github.com/algosup/2024-2025-project-3-quickest-path-team-5/blob/main/documents/Management/weeklyReport.md/weekly_report_5.md)
- [Weekly Report 6](link)
- [Weekly Report 6](https://github.com/algosup/2024-2025-project-3-quickest-path-team-5/blob/main/documents/Management/weeklyReport.md/weekly_report_6.md)


Also a cumulative document to access to all of them in one single page was made to centralize every meeting's results :
Expand Down
101 changes: 100 additions & 1 deletion documents/Management/weeklyReport.md/cumulative.md
Original file line number Diff line number Diff line change
Expand Up @@ -39,6 +39,13 @@
- [Challenges Encountered](#challenges-encountered-4)
- [Key Goals for Next Week](#key-goals-for-next-week-4)
- [Conclusion](#conclusion-4)
- [Week 6 : 10/02/2025 - 14/02/2025](#week-6--10022025---14022025)
- [Document Information](#document-information-5)
- [Objectives for the Week](#objectives-for-the-week-5)
- [Progress Summary](#progress-summary-5)
- [Challenges Encountered](#challenges-encountered-5)
- [Key Goals for Next Week](#key-goals-for-next-week-5)
- [Conclusion](#conclusion-5)


</details>
Expand Down Expand Up @@ -515,4 +522,96 @@ The team made strong progress this week by finalizing the technical specificatio
The team made excellent progress this week, completing all tasks. The project is essentially complete. Next week’s focus will be on delivering the final oral presentation and successfully closing the project.


</details>
<br>

<div align="center">

# Week 6 : 10/02/2025 - 14/02/2025

## Document Information

| Description | Information |
| -------------- | ------------- |
| Document Owner | Habi CAILLEAU |
| Creation Date | 10/02/2025 |
| Last Update | 14/02/2025 |

</div>

<br>

<div align="center">

## Objectives for the Week
</div>

- Structure and organize the oral presentation.

- Prepare individual texts for the presentation.

- Design and finalize presentation slides.

- Rehearse and refine the oral presentation.

- Conduct final adjustments to ensure a smooth and effective delivery.

<br>

<div align="center">

## Progress Summary
</div>

- **Oral Structure Creation:**
At the beginning of the week, the overall structure of the oral presentation was outlined to ensure clarity and coherence.

- **Presentation Content Development:**
Each team member worked on their individual text, ensuring that all key aspects of the project were covered.

- **Slide Design and Finalization:**
Presentation slides were created and refined to align with the prepared speeches.

- **Oral Rehearsals:**
The team dedicated time to practicing the oral presentation, making adjustments to improve delivery, timing, and transitions.

- **Final Adjustments and Polishing:**
Additional refinements were made to both the slides and spoken content, ensuring a well-structured and professional presentation.

<br>

<div align="center">

## Challenges Encountered
</div>

- Adjusting individual texts to maintain consistency and coherence in the overall presentation.

- Ensuring smooth transitions between different sections of the presentation.

- Refining speech delivery for clarity and confidence.

- Everyone didn't agree with the final presentation so we changed the slides many times.


<br>

<div align="center">

## Key Goals for Next Week
</div>

- Deliver the final oral presentation.

- Officially close the project.

<br>

<div align="center">

## Conclusion
</div>

This week was entirely focused on preparing for the oral presentation. The team successfully structured the content, developed individual texts, designed slides, and rehearsed thoroughly. Despite minor challenges in refining transitions and consistency, the team is now fully prepared. The final step next week will be delivering the presentation and officially concluding the project.


</details>
89 changes: 89 additions & 0 deletions documents/Management/weeklyReport.md/weekly_report_6.md
Original file line number Diff line number Diff line change
@@ -0,0 +1,89 @@
<div align="center">

# Weekly Project Report Team 5 - Quickest Path
## Week 6 : 10/02/2025 - 14/02/2025

### Document Information

| Description | Information |
| -------------- | ------------- |
| Document Owner | Habi CAILLEAU |
| Creation Date | 10/02/2025 |
| Last Update | 14/02/2025 |

</div>

<br>

<div align="center">

### Objectives for the Week
</div>

- Structure and organize the oral presentation.

- Prepare individual texts for the presentation.

- Design and finalize presentation slides.

- Rehearse and refine the oral presentation.

- Conduct final adjustments to ensure a smooth and effective delivery.

<br>

<div align="center">

### Progress Summary
</div>

- **Oral Structure Creation:**
At the beginning of the week, the overall structure of the oral presentation was outlined to ensure clarity and coherence.

- **Presentation Content Development:**
Each team member worked on their individual text, ensuring that all key aspects of the project were covered.

- **Slide Design and Finalization:**
Presentation slides were created and refined to align with the prepared speeches.

- **Oral Rehearsals:**
The team dedicated time to practicing the oral presentation, making adjustments to improve delivery, timing, and transitions.

- **Final Adjustments and Polishing:**
Additional refinements were made to both the slides and spoken content, ensuring a well-structured and professional presentation.

<br>

<div align="center">

### Challenges Encountered
</div>

- Adjusting individual texts to maintain consistency and coherence in the overall presentation.

- Ensuring smooth transitions between different sections of the presentation.

- Refining speech delivery for clarity and confidence.

- Everyone didn't agree with the final presentation so we changed the slides many times.


<br>

<div align="center">

### Key Goals for Next Week
</div>

- Deliver the final oral presentation.

- Officially close the project.

<br>

<div align="center">

### Conclusion
</div>

This week was entirely focused on preparing for the oral presentation. The team successfully structured the content, developed individual texts, designed slides, and rehearsed thoroughly. Despite minor challenges in refining transitions and consistency, the team is now fully prepared. The final step next week will be delivering the presentation and officially concluding the project.
Loading