Chore: Release v0.19.3
#8542
Triggered via pull request
February 13, 2025 12:23
Status
Success
Total duration
1h 37m 25s
Billable time
1h 7m
Artifacts
–
main_workflow.yml
on: pull_request
Matrix: copyright_doc_and_dependencies_check
Matrix: install_check
Matrix: linter_checks
Matrix: lock_check
gitleaks
24s
Matrix: e2e
Matrix: test
Annotations
8 errors
test (ubuntu-latest, 3.10.9)
The job running on runner GitHub Actions 16 has exceeded the maximum execution time of 90 minutes.
|
test (ubuntu-latest, 3.10.9)
The operation was canceled.
|
test (ubuntu-latest, 3.11)
The job running on runner GitHub Actions 14 has exceeded the maximum execution time of 90 minutes.
|
test (ubuntu-latest, 3.11)
The operation was canceled.
|
test (ubuntu-latest, 3.8)
The job running on runner GitHub Actions 9 has exceeded the maximum execution time of 90 minutes.
|
test (ubuntu-latest, 3.8)
The operation was canceled.
|
test (ubuntu-latest, 3.9)
The job running on runner GitHub Actions 19 has exceeded the maximum execution time of 90 minutes.
|
test (ubuntu-latest, 3.9)
The operation was canceled.
|