Expand Up @@ -6,17 +6,17 @@ Constraints include mine capacity limitations, plant demand requirements, and co

•Model: The Willow Run Coal Company operates three times minus in Kentucky and West Virginia and supplies coal to four utility power plants along the East Coast. The cost of shipping coal from each mine to each plant, the capacity at each of the fours mines and demand at each plants are shown in the table:
Mine Plant1 Plant2 Plant3 Plant4 Mine Capacity (Tons)
1 7 9 10 12 220
2 9 7 8 12 190
3 11 14 5 7 280
Demands 110 160 90 180
1 7 9 10 12 220
2 9 7 8 12 190
3 11 14 5 7 280
Demands 110 160 90 180
(tons)
The Cost of mining and processing coal is 62$ per ton in Mine1, 67 in mine 2 and 75 in mine 3.
The percentage of ash and sulfur per ton of coal at each mine is as follows:
Mine Ash% Sulfur%
1 9 6
2 5 4
3 4 3
1 9 6
2 5 4
3 4 3
Each Plant has different cleaning equipment. Plant 1 requires that the coal it receives can have no more than 6% ash and 5% sulfur; plant 2 can have no more than 5% ash and sulfur combined; plant 3 can have no more than 5% ash and 7% sulfur and plant 4 coal can have no more than 6% ash and sulfur combined. The company wants to determine the amount of coal to produce at each mine and ship to it’s customers that will minimize its total cost.