Skip to content

Czech calendar as a layer over the General Roman (and European) one #24

Czech calendar as a layer over the General Roman (and European) one

Czech calendar as a layer over the General Roman (and European) one #24

Triggered via push January 9, 2025 18:54
Status Failure
Total duration 1m 2s
Artifacts

ci.yml

on: push
Matrix: specs
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 1 warning
specs (2.0.0)
Process completed with exit code 1.
specs (2.5.0)
The job was canceled because "_2_0_0" failed.
specs (2.5.0)
The operation was canceled.
specs (2.6.5)
The job was canceled because "_2_0_0" failed.
specs (2.6.5)
The operation was canceled.
specs (2.0.0)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636