Skip to content

[minor][improvement][connector/jdbc] Optimize the Postgresql upsert q… #1069

[minor][improvement][connector/jdbc] Optimize the Postgresql upsert q…

[minor][improvement][connector/jdbc] Optimize the Postgresql upsert q… #1069

Triggered via push February 7, 2025 03:46
Status Failure
Total duration 24m 19s
Artifacts

push_pr.yml

on: push
Matrix: compile_and_test
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 4 warnings
compile_and_test (1.20.0, 8, 11, 17, 21) / compile_and_test (11)
Process completed with exit code 1.
compile_and_test (1.20.0, 8, 11, 17, 21) / compile_and_test (8)
The job was canceled because "_11" failed.
compile_and_test (1.20.0, 8, 11, 17, 21) / compile_and_test (8)
The operation was canceled.
compile_and_test (1.20.0, 8, 11, 17, 21) / compile_and_test (17)
The job was canceled because "_11" failed.
compile_and_test (1.20.0, 8, 11, 17, 21) / compile_and_test (17)
The operation was canceled.