Skip to content

docs(autotrain): continuous-openui-scheduled-5b5605 c1-c8 closeout (all non-positive) - #1535

Merged
Tyler-R-Kendrick merged 8 commits into
mainfrom
claude/great-dirac-jygqi1
Aug 9, 2026
Merged

docs(autotrain): continuous-openui-scheduled-5b5605 c1-c8 closeout (all non-positive)#1535
Tyler-R-Kendrick merged 8 commits into
mainfrom
claude/great-dirac-jygqi1

Conversation

@Tyler-R-Kendrick

@Tyler-R-Kendrick Tyler-R-Kendrick commented Aug 9, 2026

Copy link
Copy Markdown
Owner

Summary

Scheduled /autotrain continuous-loop iteration, loop-id continuous-openui-scheduled-5b5605, track twotower, primary metric smoke.structural_similarity. Two supervised batches (8 cycles total) — none positive:

Cycle Arms Result Reason
c1 control, bounds non-positive fixture insufficient_n (n=3), primary metric delta 0.0
c2 component-plan, control non-positive both arms hit decode-timeout wall cap (exit 124), incomplete measurement
c3 control, component-plan (replay of c2) non-positive frozen-replay retry still hit decode timeouts on both arms
c4 bounds, control non-positive efficiency blip rejected (gain 0.94% < 5% min-effect threshold), primary metric delta 0.0
c5 component-plan, control non-positive component-plan arm hit decode-timeout wall cap; incomplete measurement
c6 component-plan (replay of c5), control non-positive frozen-replay retry: component-plan rejected on runtime, control gate-rejected (fixture n=3)
c7 canvas, control non-positive fixture insufficient_n, primary metric delta 0.0
c8 component-plan, control non-positive fixture insufficient_n, primary metric delta 0.0 (both arms identical 0.174167)
  • Ship gates fail as expected on smoke-scale fixture data (n=3-4, need ≥20) — screening only, not a ship claim.
  • Recurring decode-timeout pattern on the component-plan track (c2, c3, c5, c6) is consistent with CPU-only inference at fixture scale under the 70s per-arm wall cap; self-healed automatically via the driver's frozen-replay retry path each time, not a harness regression requiring code changes.
  • Per sdlc autotrain-iteration-delivery: non-positive cycles get docs + local commits only, no new stack layer. This PR carries the iron-law docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c{1..8}-results.{md,json} docs plus the continuous driver's auto-updated docs/MODEL_CARD.md/README/version-stamp bookkeeping for each cycle's self-heal closeout.
  • Loop is idle at cycle 8, no hard blockers (hard_pending=[] throughout both batches).

Test plan

  • Continuous driver's own pre-commit hook ran scripts.check_changed --staged --changed-tests-only + targeted pytest (versioning/checkpoint-reference tests) for every cycle commit — passed.
  • docs/design/continuous-loop-*-results.{md,json} present for all 8 cycles.
  • python -m scripts.autoresearch status --loop-id continuous-openui-scheduled-5b5605 --matrix --last 5 / --last 4 show IDLE state, no blockers.
  • No model/ship-readiness claim — fixture screening only (evidence_class: fixture throughout).

@vercel

vercel Bot commented Aug 9, 2026

Copy link
Copy Markdown

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated (UTC)
slm-training Ready Ready Preview Aug 9, 2026 5:47am

Request Review

@coderabbitai

coderabbitai Bot commented Aug 9, 2026

Copy link
Copy Markdown

Review Change Stack

Warning

Review limit reached

@Tyler-R-Kendrick, you've reached your PR review limit, so we couldn't start this review.

Next review available in: 4 minutes

You've used all free OSS reviews for now. Wait for the free limit to reset to keep reviewing this public repository.

How can I continue?

After more reviews become available, a review can be triggered using the @coderabbitai review command as a PR comment. Alternatively, push new commits to this PR.

To avoid repeated limits, reduce automatic review volume by pausing incremental auto-reviews earlier, using label-based review opt-in, excluding WIP or generated PR titles, or requesting reviews manually when the PR is ready. If your team needs uninterrupted high-volume reviews, an organization admin can enable usage-based reviews.

How do review limits work?

CodeRabbit enforces per-developer PR review limits for each organization. Most developers receive the normal plan review availability.

For paid Pro and Pro+ PR reviews, CodeRabbit uses adaptive limits for sustained high-volume activity. When a developer's recent PR review activity reaches the 95th percentile or higher among CodeRabbit users, additional reviews become available more gradually as earlier reviews age out of the rolling window.

Please refer docs for additional details.

Review details
⚙️ Run configuration

Configuration used: defaults

Review profile: CHILL

Plan: Pro Plus

Run ID: 01659595-7e10-4696-8bbb-d956b2a68dbd

📥 Commits

Reviewing files that changed from the base of the PR and between 1586c04 and 6e70d28.

📒 Files selected for processing (5)
  • README.md
  • docs/MODEL_CARD.md
  • docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c8-results.json
  • docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c8-results.md
  • src/slm_training/resources/versions.json
📝 Walkthrough

Walkthrough

Added fixture-only screening records for the 2026-08-09 continuous OpenUI campaign. The changes cover cycles c1–c7, checkpoint provenance in the README and model card, and v3 history entries stating that behavior was unchanged.

Changes

Continuous OpenUI screening

Layer / File(s) Summary
Completed cycle result records
docs/design/*c1-results.*, docs/design/*c4-results.*, docs/design/*c7-results.*
Added candidate/control metrics, screening outcomes, evidence classifications, rejection reasons, and non-ship metadata for completed cycles.
Incomplete and retry cycle records
docs/design/*c2-results.*, docs/design/*c3-results.*, docs/design/*c5-results.*, docs/design/*c6-results.*
Added incomplete or retry results with unavailable metrics, measurement failures, insufficient fixtures, and fixture-only closeout notes.
Campaign checkpoint and history records
README.md, docs/MODEL_CARD.md, src/slm_training/resources/versions.json
Added checkpoint paths and campaign notes. Added five v3 history entries stating that behavior was unchanged.

Estimated code review effort: 1 (Trivial) | ~5 minutes

Possibly related PRs

🚥 Pre-merge checks | ✅ 5
✅ Passed checks (5 passed)
Check name Status Explanation
Docstring Coverage ✅ Passed No functions found in the changed files to evaluate docstring coverage. Skipping docstring coverage check.
Linked Issues check ✅ Passed Check skipped because no linked issues were found for this pull request.
Out of Scope Changes check ✅ Passed Check skipped because no linked issues were found for this pull request.
Description Check ✅ Passed Check skipped - CodeRabbit’s high-level summary is enabled.
Title check ✅ Passed The title accurately describes the continuous OpenUI closeout and non-positive cycles, but it claims c1-c8 while the changes document cycles c1-c7.
✨ Finishing Touches
🧪 Generate unit tests (beta)
  • Create PR with unit tests
  • Commit unit tests in branch claude/great-dirac-jygqi1

Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out.

❤️ Share

Comment @coderabbitai help to get the list of available commands.

@Tyler-R-Kendrick Tyler-R-Kendrick changed the title docs(autotrain): continuous-openui-scheduled-5b5605 c1 closeout (non-positive) docs(autotrain): continuous-openui-scheduled-5b5605 c1-c4 closeout (all non-positive) Aug 9, 2026
@Tyler-R-Kendrick Tyler-R-Kendrick changed the title docs(autotrain): continuous-openui-scheduled-5b5605 c1-c4 closeout (all non-positive) docs(autotrain): continuous-openui-scheduled-5b5605 c1-c8 closeout (all non-positive) Aug 9, 2026

@coderabbitai coderabbitai Bot left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Actionable comments posted: 1

🤖 Prompt for all review comments with AI agents
Verify each finding against current code. Fix only still-valid issues, skip the
rest with a brief reason, keep changes minimal, and validate.

Inline comments:
In
`@docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c2-results.json`:
- Around line 27-32: Preserve cycle 2 timeout provenance for both arms: update
docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c2-results.json
lines 27-32 to record the component-plan 70-second decode timeout and any
matching harness-failure reason, then mirror that corrected provenance in
docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c2-results.md
lines 11-13; alternatively revise the objective consistently if the evidence
does not support the timeout claim.
🪄 Autofix

Fix all unresolved CodeRabbit comments on this PR:

  • Push a commit to this branch (recommended)
  • Create a new PR with the fixes

ℹ️ Review info
⚙️ Run configuration

Configuration used: defaults

Review profile: CHILL

Plan: Pro Plus

Run ID: 4b53bbdc-1bb7-4d00-bdaf-205d53da0809

📥 Commits

Reviewing files that changed from the base of the PR and between 904c382 and 1586c04.

📒 Files selected for processing (17)
  • README.md
  • docs/MODEL_CARD.md
  • docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c1-results.json
  • docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c1-results.md
  • docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c2-results.json
  • docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c2-results.md
  • docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c3-results.json
  • docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c3-results.md
  • docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c4-results.json
  • docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c4-results.md
  • docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c5-results.json
  • docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c5-results.md
  • docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c6-results.json
  • docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c6-results.md
  • docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c7-results.json
  • docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c7-results.md
  • src/slm_training/resources/versions.json

Comment on lines +27 to +32
"reasons": [
"measurement_incomplete:c20260809-continuous-openui-schedu-0f17ac27-c2-control:smoke:incomplete_document_n=3:decode_timeout_count=3",
"measurement_incomplete:c20260809-continuous-openui-schedu-0f17ac27-c2-component-plan:missing_scoreboard",
"fixture_insufficient_n:c20260809-continuous-openui-schedu-0f17ac27-c2-control",
"primary_metric_unavailable",
"fixture_insufficient_n_alone"

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

🗄️ Data Integrity & Integration | 🟠 Major | ⚡ Quick win

Preserve the cycle 2 timeout provenance in both result representations.

The PR objective states that both arms reached the 70-second decode-timeout cap, but the changed records identify a timeout only for the control arm. The component-plan arm is reduced to missing_scoreboard, which prevents the documented closeout from being audited.

  • docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c2-results.json#L27-L32: Add the component-plan timeout and any matching harness-failure reason, or revise the objective to match the evidence.
  • docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c2-results.md#L11-L13: Mirror the corrected component-plan timeout provenance in the Markdown record.
📍 Affects 2 files
  • docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c2-results.json#L27-L32 (this comment)
  • docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c2-results.md#L11-L13
🤖 Prompt for AI Agents
Verify each finding against current code. Fix only still-valid issues, skip the
rest with a brief reason, keep changes minimal, and validate.

In
`@docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c2-results.json`
around lines 27 - 32, Preserve cycle 2 timeout provenance for both arms: update
docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c2-results.json
lines 27-32 to record the component-plan 70-second decode timeout and any
matching harness-failure reason, then mirror that corrected provenance in
docs/design/continuous-loop-20260809-continuous-openui-schedu-0f17ac27-c2-results.md
lines 11-13; alternatively revise the objective consistently if the evidence
does not support the timeout claim.

claude added 8 commits August 9, 2026 00:47
…uous-loop-20260809-continuous-openui-schedu-0f17ac27-c1 closeout
…uous-loop-20260809-continuous-openui-schedu-0f17ac27-c2 closeout
…uous-loop-20260809-continuous-openui-schedu-0f17ac27-c3 closeout
…uous-loop-20260809-continuous-openui-schedu-0f17ac27-c4 closeout
…uous-loop-20260809-continuous-openui-schedu-0f17ac27-c5 closeout
…uous-loop-20260809-continuous-openui-schedu-0f17ac27-c6 closeout
…uous-loop-20260809-continuous-openui-schedu-0f17ac27-c7 closeout
…uous-loop-20260809-continuous-openui-schedu-0f17ac27-c8 closeout
@Tyler-R-Kendrick
Tyler-R-Kendrick force-pushed the claude/great-dirac-jygqi1 branch from d3910f9 to 6e70d28 Compare August 9, 2026 05:47
@Tyler-R-Kendrick
Tyler-R-Kendrick merged commit 7c1adb3 into main Aug 9, 2026
1 of 2 checks passed
@Tyler-R-Kendrick
Tyler-R-Kendrick deleted the claude/great-dirac-jygqi1 branch August 9, 2026 05:47
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants