Skip to content

chore(deps): bump the dependencies group across 1 directory with 16 updates #1000

chore(deps): bump the dependencies group across 1 directory with 16 updates

chore(deps): bump the dependencies group across 1 directory with 16 updates #1000

Triggered via pull request February 1, 2025 10:27
Status Failure
Total duration 4m 19s
Artifacts

pr-build.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (macos-latest, 18)
Process completed with exit code 1.
build (ubuntu-latest, 20)
The job was canceled because "macos-latest_18" failed.
build (ubuntu-latest, 20)
The operation was canceled.
build (macos-latest, 20)
The job was canceled because "macos-latest_18" failed.
build (macos-latest, 20)
The operation was canceled.
build (ubuntu-latest, 18)
The job was canceled because "macos-latest_18" failed.
build (ubuntu-latest, 18)
The operation was canceled.