Tasks of index 2 and 3 are already scheduled on 15/11/2019 12:31 and seen:

When attempting to edit these two tasks to the same date and time 15/11/2019 12:31:

The success message "Tasks Editted" is shown at the top of the screen
[original: nus-cs2103-AY1920S1/pe-interim#2556]