Skip to content

update retry logic and logging #81

update retry logic and logging

update retry logic and logging #81

Re-run triggered December 23, 2025 18:55
Status Failure
Total duration 22s
Artifacts

test.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test (3.11)
Process completed with exit code 2.
test (3.12)
The strategy configuration was canceled because "test._3_11" failed
test (3.12)
Process completed with exit code 2.
test (3.10)
The strategy configuration was canceled because "test._3_11" failed
test (3.10)
Process completed with exit code 2.
test (3.14)
The strategy configuration was canceled because "test._3_11" failed
test (3.14)
The operation was canceled.
test (3.13)
The strategy configuration was canceled because "test._3_11" failed
test (3.13)
The operation was canceled.