Skip to content

📋 Execution Plan 2026-07-11 · consolidated merge-order (5 waves -> one ordered plan; #60 unblocks all) #74

Description

@gHashTag

Consolidated Execution Plan — 2026-07-11 (merge-order, not a new audit)

The five audit waves (PRs #59, #67, #69, #71, #73 / issues #58, #66, #68, #70, #72) are now synthesized into one dependency-ordered execution plan: docs/EXECUTION_PLAN_2026-07-11.md (branch feat/execution-plan-2026-07-11, draft PR linked below).

The single bottleneck (verified from git this session)

main does not build from a clean clone — fails in build.rs:29-30 (E0308 + E0599, 4 errors) before the library/gen/rust is reached. Ground-truth: 68 specs, 101 tests.

Nothing downstream is verifiable or regenerable until PR #60 merges. Every P1/P2 fix is spec-first with an executed cargo test acceptance criterion; none can run on a red tree.

Plan shape

Synthesis/planning only — no code edited, no merge, no hardware, no fabricated metrics.

phi^2 + phi^-2 = 3

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions