Construction

  1. Remove existing terrain (wilderness, earth, gravel, ...)
  2. Create a slope using gravel and mud mix.
    gravel ready to spread out
  3. Compress ground to avoid deformation later but maintain slope.
  4. Again double check slope to get water and be level with surrounding elements like roads, nature elements, ...
  5. Lay stones one by one in a circumverence using a rope and a center point and stone to stone distance measurements (approximation may be okay, extrapolate circle a priori to ensure that stones meet at the end).
    stone positioning guidance
  6. Using water level measure from existing stones to new stone, continuing the existing slope of the plane. Trouble can arise from wrong slope estimation in the beginning, such that the plane the stones span starts to sink into the ground and levitate at the other side. All stones have to be relaid in this case. (Happened to me.)
    check level of different circles
    check level withing a single circle
  7. Get some fine split gravel or sand. Get cement. Fill spaces inbetween stones. Optionally fill the stones entirely to ease care.
  8. Fine tune by laying nature stones in transition zone.
    nature stones garmenting right outside the circle - 1
    nature stones garmenting right outside the circle - 2
  9. Lay an empty pipe to take the hydraulic lines later.
    laying of empty pipe in the ground
  10. Decide about decorative elements (tree, shrub, statue positions)
    whole in the ground outside the circle for a bush
  11. Result
    side-view of part of the finnished circle and a bit of the outside